Seed-hawk TOOLBAR 2013 45 & XL SERIES Manuel d'utilisateur Page 49

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 113
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 48
SEEDHAWK®TOOLBAROPERATOR’SMANUAL49
6.0 SBR®
HITCH
TOOLBAR
ONLY,
LOUP
III
&
SCT
6.1 REQUIREMENTS
1.FieldmustbeseededwithG.P.S.autosteerandsamerowspacingtheyearbefore.
2.Mustseedinexactlythesamedirectionasthepreviousyear.
3.Thesensingarmmustfollowbetweenthetworowsofstubble4”6”abovetheground.
6.2 OPERATION
NOTE:BEFORE OPERATION OF THE SBR, MAKE SURE THE TOOLBAR IS FOLDED DOWN IN
WORKINGPOSITION.
1.LowertheSBRarmintofieldworkingpositionbyremovinglockingpinshowninFIGURE28.
TheSBRmustbeinthedownpositiontofunctionproperly.
2.Adjust paddle height by using the adjustment bolt at the top of the SBR arm shown in
FIGURE28,sopaddlewillrunbetweenthestubblerows.
3.Infield operationturnthe SBR switch to ON/AUTO.REFER TO SECTION 4.5,pertainingto
thecontrolsystembeingused.
4.When SBR is not in use, turn the SBR switch to CENTERING.On SCT switch boxes OFF is
centering.On LOUP III monitor switch boxes use the CENTERING switch to center the SBR
hitch,turnswitchtoOFF.REFERTOSECTION4.5,pertainingtothecontrolsystembeingused.
5.Lift the SBR arm into lock position and
insertlockingpin,FIGURE28.
Lockpinlocation
SBRad
j
ustmentbolt
FIGURE28
Vue de la page 48
1 2 ... 44 45 46 47 48 49 50 51 52 53 54 ... 112 113

Commentaires sur ces manuels

Pas de commentaire