Seed-hawk GRANULAR AND LIQUID TANKS 2008 Manuel d'utilisateur Page 38

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 56
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 37
LIQUID SYSTEM OPERATION
CHECKING FERTILIZER RUNS
Perform the following test to
ensure that each fertilizer run is
functioning properly:
1. Ensure that tank is at least
partially filled with either
water or liquid fertilizer.
2. Lower metering wheel and
proceed forward about 20
- 30 ft (6 - 9 m).
3. Stop tractor and look at
ground behind each
opener to ensure liquid
fertilizer is discharged
behind each run.
APPLYING LIQUID
FERTIILIZER
To apply liquid fertilizer, ensure
that main flow valve, 1 FIG. 42, is
open. Close the main flow valve
when not operating the liquid
fertilizer system while tank
contains any quantity of liquid
fertilizer.
1
IMPORTANT: The main
filter should be cleaned
daily. Refer to the
Maintenance section of
this Operator’s Manual
for additional information.
FIG. 42
Vue de la page 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 55 56

Commentaires sur ces manuels

Pas de commentaire